DIDIER GUEDJ, PROFESSIONAL TILE ARTISAN
|
TILE HOME | CONTACT | PHOTOS | MOSAICS |
This project was a complete renovation of an existing home. The bathrooms were completed first. The kitchen, hallway and outdoor tilework followed . Some fixtures and accessories were not yet installed when these pictures were taken. The completed kitchen floor below was covered to protect it from foot traffic when this picture was taken. Check back for updated photos of this project. |
The kitchen leads into the formal dining room which opens up to a covered outdoor patio with a newly installed fireplace and tiled floor. (below) |
A small exterior landing at the front door was tiled to the threshold. My son (3 yrs) is surveying the job while I converse with the client.(below) |
HOME | CONTACT | PHOTOS | MOSAICS |